Crystal Palace National Sports Centre Redevelopment
The Mayor of London has recently announced plans to transform the historic sports centre into a modern, accessible and sustainable facility for elite athletes, sporting clubs and the local community.
Originally opened in 1964, Crystal Palace National Sports Centre sits within Crystal Palace Park and occupies a 15-hectare site at the meeting point of five London boroughs: Bromley, Croydon, Lewisham, Lambeth and Southwark. The Grade II*-listed centre has played an important role in British sport for decades, hosting major athletics, swimming and diving events as well as the first Women's FA Cup final.
The redevelopment will provide a comprehensive refurbishment of the venue, while retaining and celebrating the site's historic character. To prepare for construction, parts of the CPNSC estate including the main sports centre building, will close from 31 December 2026.
What's happening?
- A full refurbishment of the main sports centre, with improved accessibility, an enlarged gym and new dedicated spaces for sporting clubs.
- A new six-court Padel centre, 3x3 basketball courts, five-a-side football pitches and a full-size artificial multi-sports pitch.
- The return of the diving pool and 50m swimming pool to the aquatics hall. Shallow water, 25m swimming, 50m swimming and diving will all be available within one space and on one level for the first time.
- The project will also improve movement around the site, with enhanced lighting and wayfinding and a new step-free route between the Penge and Crystal Palace sides of the park.
Subject to funding:
- A refurbished and redeveloped stadium, including accessible seating for the first time in its history.
- A new community space combining sport, leisure and play, featuring a café, 200m running track, 3x3 basketball court and outdoor gym. These community facilities are planned to be free to access and open to the public.
- Major improvements to the indoor sports zones, including an indoor 100m track, specialist weightlifting facilities and a climbing centre.
The Mayor continues to seek partners and funders to help realise this long-term vision, ensuring the whole site can reach its full potential and continue to inspire Londoners for years to come.
A greener, more sustainable sports centre
Sustainability is at the heart of the redevelopment, with the new design targeting a 98% reduction in carbon emissions, using a 'fabric first' approach to improve the energy efficiency of the existing building. Plans also include photovoltaic panels on the centre's roof and air source heat pumps for heating and cooling.
The redevelopment will also address longstanding environmental issues inside the centre. A new glazed screen will separate wet and dry areas, helping to reduce noise and humidity, while an upgraded heating strategy will significantly reduce energy demand.
When will works begin?
Morgan Sindall Construction was appointed by the Mayor of London in May 2025 to deliver the project. Since then, a pre-construction phase has been underway, focusing on the development of detailed designs and progressing the planning and listed-building consent process.
Planning permission was granted in July 2026, with major works expected to begin in early 2027. The redevelopment will mark a significant period of change for the venue as the existing facilities are transformed, with the main sports centre building expected to reopen in 2029.
Keep up to date
Stay up to date with the latest news and developments by visiting this page, as well as following our updates via email and social media.
For the latest project information visit: https://www.morgansindallconstruction.com/our-projects/live-projects/cpnsc/